Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question
6

Openings schedule and AirflowNetwork Energyplus

asked 2016-05-09 04:24:20 -0600

serena's avatar

updated 2016-05-09 09:34:51 -0600

Hi guys! I have a problem with the calculation of the AFN Linkage Node 2 to Node 1 Volume Flow Rate. I work with a graphical interface: DesignBuilder, where I created my model that has two exterior windows and a door, and I set the natural ventilation system (I simply put "activities" of the natural ventilation control temperature to zero, so that, as explained in the guide, the windows can be opened according to the opening program I entered) but when I go to do the simulation in E + the windows do not open in the opening hours that are set by the schedule, but at times that are not in any of the schedule that I have entered. For example, I have an opening time from 8 am to 10 am but my windows open at 6.50 till 7 am. have you ever had this problem? how you solved it?

Ps I checked if the schedule of the openings had been imported correctly by DesignBuilder to EnergyPlus and they are all correct.

edit retag flag offensive close merge delete

1 Answer

Sort by ยป oldest newest most voted
-1

answered 2016-05-15 16:28:15 -0600

Dave's avatar

Hi Serena, for a specific question like this you should contact your local representative (the sales office you bought it from) or send your question to the DesignBuilder Support Desk (under the Support section of our website) with your model and licence details.

edit flag offensive delete link more

Your Answer

Please start posting anonymously - your entry will be published after you log in or create a new account.

Add Answer

Training Workshops

Careers

Question Tools

1 follower

Stats

Asked: 2016-05-09 04:24:20 -0600

Seen: 269 times

Last updated: May 15 '16