My model consists of a fairly complex WSHP system with boilers and cooling towers. 40+ spaces are served by WSHPs. The model also has daylighting in many spaces. It takes approx. 18 minutes for the simulation to complete. The simulation jumps to "Processed 1 base script and 2 merged scripts" fairly quickly (approx. 62% progress). Then it takes a long time to go to the next step. Most of the time is taken by E+ while sizing systems ("Calculating System sizing") and calculating daylighting factors (I think based on the progress shown in OS). Does that seem reasonable? I am not used to seeing a simulation take so long, so want to share this and get feedback.
The simulation snapshots are saved in the file upload section.C:\fakepath\OS-3.png(/upfiles/14581392437980734.png) C:\fakepath\OS-1.png(/upfiles/1458139202950102.png)
I found one thing. When I add the E+ measure for the utility cost calculation (Tariff Selection Time and Date Dependent with Maximum Demand Charge), the simulation takes a lot more time. See image 1 - only 5 minutes compared to 18 minutes in image 2. It's surprising, but that's what's happening!
Pranav