Simulation fails; severe errors: has missing days in its schedule pointers
I'm using Energyplus 8.2.0, but my simulation fails due to some severe errors.
I import .idf file (7.0.0) from GreenBuildingStudio to Eplus lunch and I convert it, I also upload the weather file (.epw), but after simulation runs, I obtain this result:
Error File.gbs
"Program Version,EnergyPlus, Version 8.2.0-8397c2e30b, YMD=2015.10.08 12:43,IDD_Version 8.2.0
************* Beginning Zone Sizing Calculations
** Warning ** SizingPeriod:DesignDay="GBS_06M12_02_157071 WINTER", invalid data.
** ~~~ ** ..invalid field: Sky Clearness is blank.
** ~~~ ** ..Zero clear sky (no solar) will be used.
** Warning ** SizingPeriod:DesignDay="GBS_06M12_02_157071 SUMMER", invalid data.
** ~~~ ** ..invalid field: Sky Clearness is blank.
** ~~~ ** ..Zero clear sky (no solar) will be used.
** Warning ** Weather file location will be used rather than entered (IDF) Location object.
** ~~~ ** ..Location object=MONTEPULCIANO TOSC. ITALY
** ~~~ ** ..Weather File Location=Firenze-Peretola - ITA IGDG WMO#=161700
** ~~~ ** ..due to location differences, Latitude difference=[0.70] degrees, Longitude difference=[0.59] degrees.
** ~~~ ** ..Time Zone difference=[1.8E-002] hour(s), Elevation difference=[90.38] percent, [357.00] meters.
** Severe ** ProcessScheduleInput: Schedule:Year="EQUIPSCHED-49" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="EQUIPSCHED-67" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="FANSCH-48" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="HEATSCHED-7" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="COOLSCHED-7" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="PEOPLESCHED-48" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="LIGHTSCHED-49" has missing days in its schedule pointers
** Severe ** ProcessScheduleInput: Schedule:Year="DHWSCHEDULE-48" has missing days in its schedule pointers
** Fatal ** ProcessScheduleInput: Preceding Errors cause termination.
...Summary of Errors that led to program termination:
..... Reference severe error count=8
..... Last severe error=ProcessScheduleInput: Schedule:Year="DHWSCHEDULE-48" has missing days in its schedule pointers
************* Warning: Node connection errors not checked - most system input has not been read (see previous warning).
************* Fatal error -- final processing. Program exited before simulations began. See previous error messages.
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 3 Warning; 8 Severe Errors.
************* EnergyPlus Terminated--Fatal Error Detected. 3 Warning; 8 Severe Errors; Elapsed Time=00hr 00min 2.00sec"
What' s the matter? How can I solve my problem?
Can you edit your question to include the description of one of your schedules? Maybe
HEATSCHED-7
?oh, I'll try to do this in the afternoon, but I'm not sure to understand your request