First time here? Check out the Help page!
1 | initial version |
This means that you have that Assembly (R-19 Wall6) assigned to exterior wall surfaces that are both new and altered. Create a separate Construction for the Altered wall and assign it (even if it's identical to the New walls).
2 | No.2 Revision |
This means that you have that Assembly (R-19 Wall6) assigned to exterior wall surfaces that are both new and altered.
Create a separate Construction Constructions for the Altered wall and Existing walls and assign it them accordingly (even if it's they're identical to the New walls).