Answer to the Availability Schedules question: I just found this post stating that the Availability Schedules get overriden as well as the control conditions, thus need to be checked in the EMS code. I would have been in great trouble if I hadn't found it. https://unmethours.com/question/35607/discussion-on-ems-use-in-energyplus-on-opening-factor-control/

Answer to the Availability Schedules question: I just found this post stating that the Availability Schedules get overriden overridden as well as the control conditions, thus need to be checked in the EMS code. I would have been in great trouble if I hadn't found it. https://unmethours.com/question/35607/discussion-on-ems-use-in-energyplus-on-opening-factor-control/