First time here? Check out the Help page!
1 | initial version |
If all the equipment will divide the load, I think you can model all the units as only one unit with the same performance characteristics of the each unit.
I have a similar problem, but in my case I need to model two different systems (a water cooled and a VRF) to attend the same thermal zone in differents schedules.