Revision history [back]

Using the "create DOE Prototype Building" measure for the existing post-1980 large office in San Francisco I get an EUI of 55 kbtu/ft2, about 17% higher than the summary table for the original reference model in this location. (Also, just running the file in E+ v 9.1, after updating from v7.2, I get a 10% lower EUI than in DOE's summary table).

So it does not seem that this measure is currently working too well.