As far as I know, this is not directly possible.

There are some explorations on how to break a simulation into several simulation periods and running them in parallel, to then joining the results once they are completed. However, I´d be very careful with this approach as it breaks the continuity from one simulation period to the next one, and could affect peak loads.

This is probably a good read in that direction, https://drive.google.com/file/d/1dbTx9veKCFr0I1BxsaG21ijzwpfIdDWa/view?usp=sharing

Rafael