Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question

Revision history [back]

You can assign a fractional schedule to this the same way you can to space infiltration design flow rate objects. You can use a schedule set for the impacted space or space type, making sure the schedule set has an infiltration schedule assigned. You can also directly assign a schedule to an infiltration instance in a space or space type. Unlike most internal loads which have a schedule drop zone, for infiltration objects you need to use a pull down menu in the edit pane at the right side of the application while.the infiltration object is selected.