One method I can think of is to run your simulation and report only 1 variable as:

Output:Variable,"schedule name",Schedule Value,hourly;

Then you will have "YourFileName.csv" and will be an 8760 data file. You can then use that file, after changing the name to whatever you like, as a schedule file.