First time here? Check out the Help page!
1 | initial version |
OA schedules do not apply to PTACs in EnergyPlus, they have three inputs for a fixed OA flow rate during heating, cooling, and no-load operation. The PTAC templates should work just fine. Check the Supply Fan Operating Mode Schedule on the PTAC units. This schedule controls the fan operation: 0 = cycling fan, 1 = continuous fan.