First time here? Check out the Help page!
1 | initial version |
In OpenStudio the EnergyPlus object RunPeriod can be specified in the Simulation Settings tab.
2 | No.2 Revision |
In OpenStudio the EnergyPlus object The RunPeriod can be specified specifies the beginning and ending days for the simulation. In OpenStudio this object is referenced in the Simulation Settings tab.
3 | No.3 Revision |
The RunPeriod specifies the beginning and ending days for the simulation. In OpenStudio this object is referenced in the Simulation Settings tab.
I'm not aware of a way to specify the hours of the day so you may need to create a workaround for that using the other RunPeriod objects or postprocessing the output.
4 | No.4 Revision |
The RunPeriod specifies the beginning begin and ending end days for the simulation. In OpenStudio this object is referenced in the Simulation Settings tab.
I'm not aware of a way to specify the hours of the day so you may need to create a workaround for that using the other RunPeriod objects or postprocessing the output.