First time here? Check out the Help page!
1 | initial version |
The Create Baseline Building doesn't do exactly this but does use a lot of the same logic from the openStudio-standards gem. An example difference is that it won't change plug loads in your model. You also need to pass in a compled model. You could use the baseline measure in a workflow running after the Space Type and Construction Set Wizard measure that now also uses the openStudio-standards gem.
Of course you would add your geometry and assign space types, and I believe you also need to add an HVAC system to use the baseline measure.
2 | No.2 Revision |
The Create Baseline Building doesn't do exactly this but does use a lot of the same logic from the openStudio-standards openstudio-standards gem. An example difference is that it won't change plug loads in your model. You also need This measure expects to pass in have a compled model. model passed in. You could use the baseline measure in a workflow running after the Space Type and Construction Set Wizard measure that now also uses the openStudio-standards gem.openstudio-standards gem. This would set any loads, schedules, and constructions that are not altered by the baseline measure.
Of course you would add your geometry and assign space types, and I believe you also need to add an HVAC system to use the baseline measure.