Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

I am pretty sure if you use the pre-cooling tab (not heat rejection) then the cooling towers takes care of the load before the chillers. Careful with the outdoor wetbulb temperature input though. Emir

click to hide/show revision 2
No.2 Revision

I am pretty sure if you use the pre-cooling tab (not heat rejection) rejection), then the cooling towers takes take care of the load before the chillers. Careful with the outdoor wetbulb temperature input though. Emir