unmet hours for leed report Design builder
Hello there, I have a question regarding the unmet hours. I have successfully finished my simulation and both my proposed and baseline model are under 300 unmet hours (being the baseline higher than the proposed). I made the analysis based on the asrae 90.1 and i got saving s for the energy uses and for the costs. But the problem is when I generate the leed report as an excel file because when i went to the "performance outputs"sheet, it says that the unmet hours for the baseline are 10 times higher of what I saw in the leed summary in DB (the proposed unmet hours are still okay). I would like to know what is the reason and if it is possible to use my results from the leed summary of Db rather than the ones from that excel file. thank youuu



